
2026-08
Two constant-pressure booster sets pressure-tested and shipped
Pump sets, tanks and control cabinets packed as complete skids; test records and installation notes travel with the goods.
Shipments, new stock and company updates, posted as they happen.

Pump sets, tanks and control cabinets packed as complete skids; test records and installation notes travel with the goods.

Common OH1 and OH2 sizes covered, material certificates on file — curves and drawings available on inquiry.

Piping and jockey units supplied along, full inspection documents with the goods, supported through acceptance.

Product range, project references and contacts will keep growing — bookmark us.

Lifted into place and wired through to trial run — photos in the projects section.
JIAQUAN.
0%
Priming
Click or press Esc to skip